TM 5-5420-202-20-2
MULTIPLE FLUID PRESSURE LINE CONNECTOR REPLACEMENT (Sheet 1 of 6)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
6-101
Inspection
6-103
Installation
6-103
TOOLS: 1-1/8 in. deep well socket with 1/2 in. drive
1/2 in. socket with 1/2 in. drive
11/16 in. combination box and open end wrench
1 in. combination box and open end wrench
1-1/8 in. combination box and open end wrench
Flat-tip screwdriver
Ratchet with 1/2 in. drive
SPECIAL TOOLS: Ground hop kit (Item 31, Chapter 3, Section 1)
PRELIMINARY PROCEDURES:
Remove powerplant (page 5-2)
Remove rear engine cooling fan (page 9-55)
REMOVAL:
1.
Using 11/16 inch wrench, disconnect hoses (A) and
(B) from connector (C).
Go on to Sheet 2
6-101