POWERPLANT RIGHT BANK OIL COOLER FRAME ANDBRACKETS REPLACEMENT (Sheet 7 of 9)
TM 5-5420-202-20-2
6.
7.
8.
9.
Using alining punch, line up holes for screws(F).
Using 1/2 inch socket with extension or
1/2 inch wrench, install five screws (F).
Using 9/16 inch socket, install capscrew, flat washer, and self-locking nut (G). Use 9/16
inch wrench to keep nut from turning.
Using 1/2 inch socket, install three screws (H) and
cushioned clamp holding timing access cover to frame.
10.
Using alining punch, line up holes for cap-
screws and new self-locking nuts (J).
11.
Using 9/16 inch socket, install six capscrews
and self-locking nuts (J). Use 9/16 inch
wrench to keep nuts from turning.
Go to Sheet 8
6-123