TM-5-5420-228-24

LAUNCHER HYDRAULICS SYSTEM M48A5/M60A1 TANK CHASSIS, TRANSPORTING: FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL

AUGUST 1985

  TM-5-5420-228-24 - Page 714 of 750

TM 5-5420-228-24
GENERAL MAINTENANCE - Continued
Dowel Pin Installation
TOOLS: Ball peen hammer
SUPPLIES:
Wooden block (make from Item 25,
Appendix D)
1.
Place pin (A) into hole (B), keeping pin (A) as
straight as possible.
CAUTION
If pin (A) is tapped too hard, end
will flatten out and pin (A) will
not properly seat.
2.
Using hammer, lightly tap in pin (A) until
seated.
3.
If pin (A) cannot be driven by lightly taping
with hammer, using wooden block (C), put
wooden block against pin (A) and hit with
hammer until pin (A) is seated.
End of Task
C-20
TA251290


Back to Top