TM 9-1240-401-34&P
11
Remove tapered pin (23), handwheel assembly (24), spring tension washer (25), recessed washer (26), and preformed
packing (27). Discard preformed packing.
12
Remove three screws (28) and screw (29) from quadrant spacer (21).
13
Using brass drift and hammer, tap quadrant spacer (21) away from two straight pins (30). Rotate quadrant spacer (21)
and remove woodruff key (31).
14
Remove quadrant spacer (21) and preformed packing (32). Discard preformed packing.
15
Remove cap (33), valve core (34), valve stem (35), and retaining strap (36) from shaft (37).
16
Remove three screws (38) securing shaft (37) to bracket (39).
17
Tap shaft (37) away from two straight pins (40). Remove shaft (37) and preformed packing (41) from bracket (39).
Discard preformed packing.
18
Remove bracket (39) from M15 quadrant.
Change 1
5.1-37