TM 9-1240-401-34&P
5.1-24. M15 QUADRANT FINAL INSPECTION AND ADJUSTMENT - continued
c.
BAR (GUNNER’S QUADRANT SEAT) FINAL ADJUSTMENT
1
2
3
4
5
6
Ensure that bar (1) is installed on M15 quadrant with
one straight pin (2).
Ensure that spring (3) and screw (4) have been
installed.
Place known good gunner’s quadrant on machined
quadrant seats of bar (1) and adjust screw (4) until
bubble of gunner’s quadrant is centered.
Using feeler gage between housing and bar (1),
determine the number of shims (item 19, appx B)
necessary to hold bar in place for drilling and
reaming for straight pin (2).
Install shims as necessary between bar (1) and
housing and tighten screw (4) to secure bar (1) for
drilling.
Remove M15 quadrant from cross-leveling fixture.
5.1-64
Change 1