TM 9-1240-401-34&P
1
2
Install M15 quadrant on cross-leveling fixture (ref.
Section a, para 5.1-24). Perform steps 7 thru 9 of
fixture setup procedure (ref. Section a, para 5.1-24).
Turn spur gear (1) until correction counters register
00 mils. Turn elevation handwheel (2) until elevation
counter registers 0000 mils.
3
4
5
Adjust elevation handwheel (2) to center bubble of
fire control level (3).
Loosen three screws (4) to disengage differential
spur gear (5) from spur gear (6).
Rotate differential spur gear (5) to zero counter, then
tighten three screws (4).
Change 1
5.1-67