TM9-1240-401-34&P
18
Check bubble of fire control level (14); if not
centered, loosen ring (12) and readjust eccentric
bushing (13) to center bubble of fire control level
(14)
19
Rotate elevation handwheel (2) of M15 quadrant to
turn elevation counter (15) to 0.
20
Rotate upper handwheel (16) of cross-leveling
fixture counterclockwise until bubble of fire control
level (3) centers.
21
If bubble of fire control level (14) does not center,
turn cross-level knob (11) until bubble centers in fire
control level (14).
22
Repeat steps 16 thru 19 until bubble in fire control
level (14) is approximately centered. Seal ring (12)
using adhesive (item 1.1, appx B).
23
Return cross-leveling fixture to level position.
24
Remove cross-level knob (11) from M15 quadrant.
25
Install cover assembly, knob assembly, cross-level
knob, and associated parts (ref. para 5.1-14).
Change 1
5.1-69