TM-9-1290-365-24-P

PALADIN MUZZLE VELOCITY SYSTEM M93 UPGRADED

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

OCTOBER 2000

  TM-9-1290-365-24-P - Page 84 of 334

ARMY TM 9-1290-365-24&P
4.3.1 Installation of Transceiver Assy on Gun.
a. Place Bracket Assy (with Transceiver Assy already mounted) on its position on gun.
b. Using hex socket wrench, tighten the bracket 1/2" screw.
c. Verify Transceiver Assy is properly fastened to gun bracket.
d. Verify Transceiver Assy is properly mounted to Mounting Bracket Assy and all screws are
fastened.
4.3.2 System Interconnection.
a. Verify AFCS Power switch is in OFF position.
b. Connect Transceiver Assy to 5-meter Power and Data Cable using 0.75-meter Power
and Data Cable. (See Figure 1-2.)
TRANSCEIVER ASSY
POWER AND DATA
CABLE (0.75-M)
MOUNTING BRACKET ASSY
POWER AND DATA
CABLE (5-M)
1553 TERMINATION
M129-11
Figure 4-1. M93 MVS Installation
4-2


Back to Top