FOLLOW-ON MAINTENANCE
1.
Fill cooling system to proper level. (WP
0287)
2.
Hood closed and secured. (TM 9-2320-272-10)
3.
Install right splash shield. (TM 9-2320-272-10)
4.
Start engine and check for coolant leaks. Tighten fittings and clamps as necessary. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0285
0285-10