INSTALLATION
1.
Install elbow hose (Figure 5, Item 14) on transmission oil cooler (Figure 5, Item 15) with clamp
(Figure
5,
Item
13).
2.
Install tube (Figure 5, Item 10) on elbow (Figure 5, Item 14) with clamp (Figure 5, Item 13).
3.
Install elbow hose (Figure 5, Item 12) on outlet port (Figure 5, Item 1) and tube (Figure 5, Item 10) with two
clamps (Figure 5, Item 11).
4.
Install hump hose (Figure 5, Item 9) on transmission oil cooler (Figure 5, Item 15) with clamp
(Figure
5,
Item
8).
5.
Install tube (Figure 5, Item 7) on hump hose (Figure 5, Item 9) with clamp (Figure 5, Item 8).
6.
Install hump hose (Figure 5, Item 6) on tube (Figure 5, Item 7) and outlet tube (Figure 5, Item 4) with two clamps
(Figure 5, Item 5).
2
3
4
5
6
5
7
8
10
9
8
14
15
13
12
11
11
1
M9580DAA
Figure 5.
Coolant Hoses and Lines Installation.
TM 9-2320-272-23-2
0285
0285-6