TM-9-2320-272-23-2

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 2 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-2 - Page 559 of 1417

INSTALLATION - Continued
CAUTION
Ensure drain valve on aftercooler is open when filling cooling system. Failure to do so may
result in damage to equipment.
16.
Connect air lines (Figure 9, Items 3 and 5) to elbows (Figure 9, Items 1 and 4). Secure air lines
(Figure
9,
Items
3
and
5) to radiator inlet tube (Figure 9, Item 16) with tiedown straps (Figure 9, Item 2), as
required.
16
2
1
2
3
2
5
4
M0022DAA
Figure 9.
Air Lines Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install air cleaner hose. (WP
0248)
2.
Fill coolant to proper level. (WP
0287)
3.
Start engine and check for leaks. (TM 9-2320-272-10)
4.
Check coolant level and add coolant as necessary. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0222
0222-16


Back to Top