INSTALLATION - Continued
M0037DAA
10
11
12
13
14
15
16
17
18
23
19
20
21
22
1
2
3
4
5
6
7
8
9
Figure 2.
Air Cleaner Intake Pipe Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install ether valve and bracket. (WP
0263)
2.
Start engine and check for air leaks. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0246
0246-5/6 blank