TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 1245 of 1469

INSTALLATION - Continued
19.
Install electrical lead ground bolt to right side frame rail (Volume 4, WP
0593).
20.
Install spare tire carrier (WP
0522) or (WP
0523).
21.
Install primary air tank rear strap (Figure 19, Item 3) with two screws (Figure 19, Item 2) on crossmember
(Figure 19, Item 1).
M10169DAA
1
2
3
Figure 19.
Primary Air Tank Installation.
22.
Install primary air tank (WP
0440).
23.
Connect cross shaft lever (Figure 19, Item 1) to transfer case shift rod (WP
0385) or (WP
0386).
TM 9-2320-272-23-3
0513
0513-20