TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 179 of 1469

INSTALLATION - Continued
57.
Install clamp (Figure 17, Item 12) on right firewall (Figure 17, Item 1) with washer (Figure 17, Item 14) and
screw (Figure 17, Item 13).
58.
Install three clamps (Figure 17, Item 5) on right firewall (Figure 17, Item 1) with screws (Figure 17, Item 15).
59.
Connect wire (Figure 17, Item 18) to personnel hot water heater wire (Figure 17, Item 19).
60.
Connect wires (Figure 17, Items 10 and 11) to circuit breaker (Figure 17, Item 9).
61.
Connect wires (Figure 17, Items 7 and 8) to circuit breaker (Figure 17, Item 6).
62.
Connect wire (Figure 17, Item 16) to transorb diode coupling (Figure 17, Item 17).
63.
Connect wires (Figure 17, Items 3 and 4) to horn solenoid (Figure 17, Item 2).
3
4
5
M10060DAA
1
2
6
7
8
9
10
11
12
13
14
15
16
17
18
19
15
15
5
5
Figure 17.
Front Wiring Harness Replacement.
TM 9-2320-272-23-3
0358
0358-30


Back to Top