FOLLOW-ON MAINTENANCE
1.
Lubricate rear axle. (Volume 5, WP
0820)
2.
Start engine and allow air system to build to normal operating pressure. Check air lines for leaks. Road test
vehicle. (TM 9-2320-272-10)
3.
Perform axle leakage test. (WP
0415)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0414
0414-14