REMOVAL
1.
Remove four screws (Figure 1, Item 12), lockwashers (Figure 1, Item 13), washers (Figure 1, Item 14), and
rear cable guard (Figure 1, Item 2) from boom (Figure 1, Item 1). Discard lockwashers.
2.
Remove two locknuts (Figure 1, Item 4), screws (Figure 1, Item 6), and spacers (Figure 1, Item 3) from inner
boom (Figure 1, Item 5). Discard locknuts.
WARNING
Wear hand protection when handling winch cable. Do not handle cable with bare hands.
Broken wires may be sharp. Failure to comply may result in injury or death to personnel.
NOTE
Maintain manual tension on hoist cable when removing block from cable clevis.
3.
Unwind hoist cable (Figure 1, Item 7) (TM 9-2320-272-10) until snatch block (Figure 1, Item 8) touches ground.
Place hoist control in NEUTRAL position.
4.
Remove nut (Figure 1, Item 9), anchor bolt (Figure 1, Item 10), and cable clevis (Figure 1, Item 11) from snatch
block (Figure 1, Item 8).
5.
Install anchor bolt (Figure 1, Item 10) and nut (Figure 1, Item 9) on snatch block (Figure 1, Item 8) for storage.
TM 9-2320-272-23-4
0709
0709-2