REMOVAL - Continued
2.
Pull cable (Figure 2, Item 4) out over level wind pulley (Figure 2, Item 1), down through tensioner sheaves
(Figure 2, Item 2), and out of rollers (Figure 2, Item 5), and side of rollers (Figure 2, Item 3).
M5255DAA
1
2
3
4
5
3
5
2
Figure 2.
Rear Winch Cable Removal.
END OF TASK
INSTALLATION
1.
Thread cable (Figure 3, Item 4) into center of side rollers (Figure 3, Item 3), rollers (Figure 3, Item 5), tensioner
sheaves (Figure 3, Item 2), under level wind pulley plate (Figure 3, Item 1), and over level wind pulley
(Figure
3,
Item
6).