INSTALLATION
1.
Position hoist cylinders (Figure 4, Items 1 and 5) on subframe (Figure 4, Item 7) with bypass tubes
(Figure
4,
Item
5) facing down.
2.
Install each hoist cylinder (Figure 4, Items 1 and 6) with two bearing caps (Figure 4, Item 2), four lockwashers
(Figure 4, Item 4), and screws (Figure 4, Item 3).
M10229DAA
1
2
3
4
5
3
4
2
5
6
7
Figure 4.
Dump Hoist Cylinder Installation.
TM 9-2320-272-23-4
0724
0724-5