INSTALLATION
1.
Install two bearings (Figure 2, Item 5) in roller (Figure 2, Item 6).
2.
Install grease fitting (Figure 2, Item 8) in shaft (Figure 2, Item 7).
3.
Install shaft (Figure 2, Item 7) in roller (Figure 2, Item 6).
4.
Install two braces (Figure 2, Item 4) on shaft (Figure 2, Item 7) with two cotter pins (Figure 2, Item 3).
5.
Install two roller braces (Figure 2, Item 4) on boom (Figure 2, Item 1) with four screws (Figure 2, Item 2) and
locknuts (Figure 2, Item 9).
3
M6055DAA
1
2
3
8
9
4
5
5
6
7
4
Figure 2.
Hoist Level Wind Installation.
END OF TASK
END OF WORK PACKAGE