REMOVAL
NOTE
Front and rear roller braces are replaced the same way.
1.
Remove four locknuts (Figure 1, Item 9), screws (Figure 1, Item 2), and two front roller braces
(Figure
1,
Item
4) from boom (Figure 1, Item 1). Discard locknuts.
2.
Remove two cotter pins (Figure 1, Item 3) from shaft (Figure 1, Item 7). Discard cotter pins.
3.
Remove shaft (Figure 1, Item 7) and level wind roller (Figure 1, Item 6) from two roller braces
(Figure
1,
Item
4).
4.
Remove shaft (Figure 1, Item 7) from roller (Figure 1, Item 6).
5.
Remove two bearings (Figure 1, Item 5) from roller (Figure 1, Item 6).
6.
Remove grease fitting (Figure 1, Item 8) from shaft (Figure 1, Item 7).
3
M6054DAA
1
2
3
8
9
4
5
5
6
7
4
Figure 1.
Hoist Level Wind Removal.
END OF TASK
TM 9-2320-272-23-4
0697
0697-2