INSTALLATION
1.
Install chain (Figure 9, Item 3) on hoist winch (Figure 9, Item 6) and attach to lifting device (Figure 9, Item 2).
WARNING
•
All personnel must stand clear during lifting operations. A swinging or shifting load may
occur. Failure to comply may result in injury or death to personnel.
•
Ensure lifting capacity is greater than weight of hoist winch (400 lb) (182 kg). Failure to
comply may result in damage to equipment, injury, or death to personnel.
NOTE
Assistant will help with Steps (2) and (3).
2.
Raise hoist winch (Figure 9, Item 6) and position on boom (Figure 9, Item 1).
3.
Install hoist winch (Figure 9, Item 6) on boom (Figure 9, Item 1) with 12 lockwashers (Figure 9, Item 4) and
screws (Figure 9, Item 5).
M6061DAA
2
3
4
5
6
1
Figure 9.
Hoist Winch Installation.
END OF TASK
TM 9-2320-272-23-4
0696
0696-20