TM-9-2320-328-13-P-1

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 1 OF 3

MARCH 2009

  TM-9-2320-328-13-P-1 - Page 800 of 1318

TM 9-2320-328-13&P-1
0073-14
DRAFT
0073
HWT0980A
Step 19.
Reconnect main wire harness pump operator’s panel 11-pin wire harness connector.
With a test lead set, check for continuity across pump operator’s panel wire harness
wire 1590 (red) from main wire harness main 3 connector, terminal F, to pump
operator’s panel wire harness diode pack connector, terminal B.
a.
If there is continuity, repair wire 1590 in cab pump control wire harness
if repairable (TM 9-2320-325-14&P), or replace cab pump control wire
harness (WP 0281).
b.
If there is no continuity, repair wire 1590 in pump operator’s panel wire
harness if repairable (TM 9-2320-325-14&P), or replace pump
operator’s panel wire harness (WP 0303).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION


Back to Top