TM 9-2320-328-13&P-2
0306-3/(4 blank)
DRAFT
0306
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2.
Install red wire (3) and black wire (2) on pump house heater test switch (4) with two screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump house access door assembly (WP 0009)
2.
Install pump house panel E (WP 0339)
END OF TASK
END OF WORK PACKAGE
HWT2570