TM 9-2320-328-13&P-2
0251-3/(4 blank)
DRAFT
0251
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4.
Install high amperage cable (2) on primer pump solenoid (3) with locknut (1).
5.
Install pump house panel G (WP 0339).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
HWT2357