TM 9-2320-328-13&P-2
0250-3/(4 blank)
DRAFT
0250
Change 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Alignment pin must align with hole on adapter before tightening nut.
2.
Align alignment pin (7) on flow sensor (4) with hole in adapter (5).
3.
Install flow sensor (4) on adaptor (5) and tighten nut (3).
4.
Connect flow sensor wire harness connector (2) to flow sensor connector (1).
END OF TASK
FOLLOW ON MAINTENANCE
1.
Install pump house access panel G (WP 0339)
2.
Calibrate pump operator’s panel electric valve controller (WP 0210)
END OF TASK
END OF WORK PACKAGE
HWT0559