TM-9-2320-328-13-P-2

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 2 OF 3

MARCH 2009

  TM-9-2320-328-13-P-2 - Page 979 of 1390

TM 9-2320-328-13&P-2
0271-3
DRAFT
0271
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4.
Remove two screws (13) and tank-to-pump valve (14) from shutoff control valve manifold (9).
5.
Remove two screws (15) and solenoid (16) from tank-to-pump valve (14).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6.
Remove three preformed packings (17) from shutoff control valve manifold (9).
Discard preformed packing.
7.
Remove preformed packing (18) from shutoff control valve manifold (9).
Discard preformed packing.
END OF TASK
INSTALLATION
1.
Install preformed packing (18) on shutoff control valve manifold (9).
2.
Install three preformed packing (17) on shutoff control valve manifold (9).
HWT2427
HWT2428


Back to Top