TM-9-2320-361-20

2-1/2-TON, 6x6, M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; UNIT MAINTENANCE

OCTOBER 1991

  TM-9-2320-361-20 - Page 733 of 1207

TM 9-2320361-20
11-22. CAB TUNNEL, REAR TUNNEL, AND TOEBOARD REPLACEMENT
This task covers:
a. Tunnel Removal
d. Toeboard Installation
b. Rear Tunnel Removal
e. Rear Tunnel Installation
c. Toeboard Removal
f. Tunnel Installation
INITIAL SETUP:
APPLICABLE MODELS
REFERENCES (TM)
All
TM 9-2320-361-10
MATERIALS/PARTS
TM 9-2320-361-20P
Twenty-nine lockwashers
EQUIPMENT CONDITION
Parking brake set (TM 9-2320-361-10).
Companion seat removed (para. 11-26).
a. Tunnel Removal
Remove thirteen screws (3), lockwashers (4), washers (5), and tunnel (2) from rear tunnel (6),
toeboard (1), and cab floor (7). Discard lockwashers (4).
b. Rear Tunnel Removal
Remove eight screws (3), lockwashers (4), washers (5), and rear tunnel (6) from cab floor (7). Discard
lockwashers (4).
c. Toeboard Removal
Remove eight screws (3), lockwashers (4), washers (5), and toeboard (1) from cab floor (7). Discard
lockwashers (4).
d. Toeboard Installation
Install toeboard (1) on cab floor (7) with eight washers (5), new lockwashers (4), and screws (3).
e. Rear Tunnel Installation
Install rear tunnel (6) on cab floor (7) with eight washers (5), new lockwashers (4), and screws (3).
f. Tunnel Installation
Install tunnel (2) on rear tunnel (6), toeboard (1), and cab floor (7) with thirteen washers (5), new
lockwashers (4), and screws (3).
11-36


Back to Top