TM-9-2330-227-14-P

SEMITRAILER, VAN: SHOP, 6-TON, SINGLE AXLE, M146

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JUNE 1985

  TM-9-2330-227-14-P - Page 258 of 576

TM 9-2330-227-14&P
LAMP BOX
This task covers:
a. Removal (page 4-172)
b. Installation (page 4-172)
INITIAL SETUP
Tools
Tools - Continued
Extension, 3/8-inch drive, 6-inch
Socket, 3/8-inch drive, 7/16-inch
Handle, ratchet, 1/4-inch drive
Wrench, box-end, 7/16-inch
Handle, ratchet, 3/8-inch drive
Screwdriver, cross-tip, number two
Personnel Required
Socket, 1/4-inch drive, 7/16-inch
One
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1.
Box (1)
2.
Box (1) and
frame member (4)
3.
Frame member (4)
4.
Hook clamp (2)
and box (1)
5.
Box (1)
INSTALLATION
6.
7.
Hook clamp (2)
and box (1)
8.
Frame member (4)
4-172
Hook clamp (2)
and lid (3)
Three screws (5),
Iockwashers (6),
and nuts (7)
Box (1)
Two screws (8)
and nuts (9)
Hook clamp (2)
Hook clamp (2)
Two screws (8)
and nuts (9)
Box (1)
a. Lift and unhook clamp (2).
b. Open lid (3).
a. Have assistant hold box (1).
b. Using 7/16-inch socket, extension,
ratchet handle with 3/8-inch drive,
and 7/16-inch box-end wrench,
unscrew and take off.
Take off.
Using number two cross-tip screwdriver,
3/8-inch socket, and ratchet handle with
with 1/4-inch drive, unscrew and take off.
Take off.
Put in place.
Screw in, and tighten using number two
cross-tip screwdriver, 3/8-inch socket,
and ratchet handle with 1/4-inch drive.
Put in place.


Back to Top