TM-9-2330-335-14-P

SEMITRAILER, TACTICAL, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, RESET M871R, M871A1R AND M871A2R

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE MANUAL (INCLUDES REPAIR PARTS AND SPECIAL TOOLS LIST)

SEPTEMBER 2008

  TM-9-2330-335-14-P - Page 110 of 640

TM 9-2330-335-14&P
0014-8
0014
16
Before
Suspension
WARNING
Notify Organizational
Maintenance at first month of new
semitrailer operation or first 1,000
miles (1,609 km) (from
HUBODOMETER®) that
suspension nuts must be torqued.
Reference Item No. 1 of
Organizational PMCS. Failure to
comply could cause loss of
suspension/parts which could
result in injury to personnel and
damage to equipment.
Visually inspect for broken or shifted leaf
springs and loose or missing hardware.
Notify Organizational Maintenance.
Springs have shifted or are
broken and hardware is loose or
missing.
17
Before
Air Reservoir
Tanks
WARNING
Wear protective goggles when
opening drain cock and avoid the
air stream. Failure to comply
could result in injury to personnel.
a. Make sure drain valves do not leak air. Drain valves leak air.
b. Inspect air tanks for damage, loose
fittings, missing hardware, and any
evidence of air leakage.
Any air leaks are present or
hardware is missing.
c. Inspect drain valve pull cables for a
frayed or broken condition.
18
Before
Stowage Box
and Door
Open and close door, make sure hinge
does not bind, and all mounting/securing
hardware is tight and present. Make sure
drain holes are not blocked. Ensure jack is
secure and door seal is in good condition.
Keep box clean and serviceable.
Hardware loose or missing.
Table 1. Operator Preventive Maintenance Checks and Services (PMCS) - Continued.
ITEM
NO.
INTERVAL
MAN-
HOURS
LOCATION
ITEM TO
CHECK/
SERVICE
PROCEDURE
NOT FULLY MISSION
CAPABLE IF:


Back to Top