TM-9-2330-335-14-P

SEMITRAILER, TACTICAL, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, RESET M871R, M871A1R AND M871A2R

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE MANUAL (INCLUDES REPAIR PARTS AND SPECIAL TOOLS LIST)

SEPTEMBER 2008

  TM-9-2330-335-14-P - Page 111 of 640

0014-9
TM 9-2330-335-14&P
0014
19
Before
Twist Locks
CAUTION
Make sure there is no debris in
ISO container lock slots that
would prevent twist lock
engagement and positive locking.
Failure to comply could cause
damage to equipment.
Check to make sure there is no debris in
the lock pocket that would interfere with
lock operation. Make sure twist locks (all)
operate freely and do not bind.
Twist locks are missing and are
required for mission.
20
Before
Tiedowns
CAUTION
Deformation of any part of D-ring
is not allowed. Notify
Organizational Maintenance.
Failure to comply could cause
damage to equipment.
Check all tiedowns for missing hardware,
damage, cracked welds, and deformation.
Notify Organizational Maintenance.
Damaged, deformed, and cracked
welds are evident.
21
Before
Brakes
a. With prime mover coupled, prior to
start of mission, have a person observe if
trailer brakes are working. Hold brake
pedal down and try to slowly move tractor
forward. Observe if trailer tires move. If
tires move, brakes are not holding.
b. Notify Organizational Maintenance,
NMC, if trailer tires move when brakes
are applied.
Table 1. Operator Preventive Maintenance Checks and Services (PMCS) - Continued.
ITEM
NO.
INTERVAL
MAN-
HOURS
LOCATION
ITEM TO
CHECK/
SERVICE
PROCEDURE
NOT FULLY MISSION
CAPABLE IF:


Back to Top