TM-9-2330-335-14-P

SEMITRAILER, TACTICAL, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, RESET M871R, M871A1R AND M871A2R

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE MANUAL (INCLUDES REPAIR PARTS AND SPECIAL TOOLS LIST)

SEPTEMBER 2008

  TM-9-2330-335-14-P - Page 120 of 640

TM 9-2330-335-14&P
0016-2
0016
Table 1. Organizational Preventive Maintenance Checks and Services (PMCS).
ITEM
NO.
INTERVAL
MAN-
HOURS
LOCATION
ITEM TO
CHECK/
SERVICE
PROCEDURE
NOT FULLY MISSION
CAPABLE IF:
NOTE
• Perform Operator PMCS prior to,
or in conjunction with, Organiza-
tional PMCS if there is a delay
between daily operation of the
equipment and the Organizational
PMCS or regular operator is not
assisting/participating.
• Clean axle and suspension system
with low-pressure water and fiber
brush to allow for careful inspec-
tion.
1F
i
r
s
t
M
o
n
t
h
or First 1,000
Miles of
Operation
Suspension
Initial Torque
a. Torque suspension nuts to the
following in-service DRY torque values:
1-1/8 in.-12 UNF. . 880 lb-ft (1,193 Nm)
3/4 in.-16 UNF . . . . .300 lb-ft (407 Nm)
5/8 in.-18 UNF . . . . .180 lb-ft (244 Nm)
Torque service requirements/
schedule are not met. Nuts or
bolts are damaged.
b. New replacement installations/
hardware should have WET (oiled)
fasteners. The following wet torque
values apply:
1-1/8 in.-12 UNF . .670 lb-ft (908 Nm)
3/4 in.-16 UNF . . . .220 lb-ft (298 Nm)
5/8 in.-18 UNF . . . .130 lb-ft (176 Nm)


Back to Top