TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 674 of 1348

INSTALLATION - Continued
14.
Apply sealing compound on threads of fitting (Figure 6, Item 6).
15.
Install fitting (Figure 6, Item 6) on bulkhead coupler (Figure 6, Item 5).
16.
Install air line (Figure 6, Item 7) on fitting (Figure 6, Item 6).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Charge air system (TM 9-2330-342-10). (WP
0190)
2.
Check for air leaks. (WP
0047)
3.
Remove wheel chocks (TM 9-2330-342-10). (WP
0190)
END OF TASK
END OF WORK PACKAGE
TM 9-2330-342-23&P
0073
0073-6


Back to Top