TM 9-2350-260-20-1-2
ENGINE TO TRANSMISSION OIL LINE TUBE ASSEMBLIES (LEFT INNER AND OUTER) REPLACEMENT (2D
ENGINE) (Sheet 2 of 4)
NOTE
Place rags (Item 65, Appendix D) under fittings (J), (A), (K), and (C).
Upon
removing tubes and fittings, seal powerplant openings with plastic barrier material
(Item 41, Appendix D) and masking tape (Item 57, Appendix D) to prevent
unnecessary exposure to moisture and contamination.
Remove plastic barrier
material and masking tape when installing tubes and fittings.
REMOVAL:
1.
Using 1-5/8 inch wrench to hold adapter (A), use 1-1/2 inch wrench and loosen connector (B).
2.
Using 1-5/8 inch wrench to hold adapter (C), use 1-1/2 inch wrench and loosen connector (D).
3.
Using hands, disconnect and remove tube (E) from powerplant.
4.
Using 1-5/8 inch wrench, remove adapters (A) and (C) and gaskets (F) and (G).
Throw gaskets away.
5.
Using 1-5/8 inch wrench to hold adapter (H), use 1-1/2 inch wrench and loosen connector (J).
6.
Using 1-5/8 inch wrench to hold adapter (K), use 1-1/2 inch wrench and loosen connector (L).
7.
Using hands, disconnect and remove tube (M) from powerplant.
8.
Using 1-5/8 inch wrench, remove adapters (H) and (K) and gaskets (N) and (P).
Throw gaskets away.
Go on to Sheet 3
TA147634
6-188