TM-9-2350-260-20-1-2

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 2 OF 4, CHAPTERS 5 THRU 9

  TM-9-2350-260-20-1-2 - Page 263 of 772

TM 9-2350-260-20-1-2
ENGINE TO TRANSMISSION OIL LINE TUBE ASSEMBLIES (RIGHT INNER AND OUTER) REPLACEMENT (2D
ENGINE) (Sheet 4 of 4)
11.
Remove rags placed under transmission connectors (J) and (R) and oil cooler connectors (H) and (Q).
12.
Replenish oil lost during oil line tube assemblies removal (LO 9-2350-260-12).
13.
Connect powerplant for powerplant ground hop (page 5-54).
14.
Start and run engine.
Check for oil leaks at oil cooler and transmission oil line tube assembly connections.
15.
Shut down engine.
Disconnect powerplant from ground hop kit (page 5-67).
16.
Install engine shroud (page 9-3).
17.
Install rear engine shroud support (page 9-5).
18.
Install powerplant (page 5-40).
End of Task
TA147632
6-186


Back to Top