TM 9-2350-260-20-1-2
ENGINE TO TRANSMISSION OIL LINE TUBE ASSEMBLIES (LEFT INNER AND OUTER) REPLACEMENT (2D
ENGINE) (Sheet 3 of 4)
INSTALLATION:
1.
Position new gaskets (A) and (B) onto adapters (C) and (D).
2.
Using 1-5/8 inch wrench, install adapter (C) into oil cooler (E).
3.
Using 1-5/8 inch wrench, install adapter (D) into transmission mount (F).
4.
Position tube (G) through engine shroud and, using 1-1/2 inch wrench on connector (H), tighten connector (H) onto
adapter (C).
5.
Using 1-1/2 inch wrench on connector (J), tighten connector (J) onto adapter (D).
6.
Position new gaskets (K) and (L) onto adapters (M) and (N).
7.
Using 1-5/8 inch wrench, install adapter (M) into oil cooler (E).
8.
Using 1-5/8 inch wrench, install adapter (N) into transmission oil line mount (F).
9.
Position tube (P) through engine shroud and, using 1-1/2 inch wrench on connector (Q), tighten connector (Q) onto
adapter (M).
10.
Using 1-1/2 inch wrench on connector (R), tighten connector (R) onto adapter (N).
Go on to Sheet 4
TA147635
6-189