TM 9-2350-260-20-1-2
ENGINE TO TRANSMISSION OIL LINE TUBE ASSEMBLIES (INNER AND OUTER) REPLACEMENT (2A ENGINE)
(Sheet 2 of 5)
REMOVAL:
NOTE
Tag oil cooler tubes as they are removed for later installation.
Removal of left and
right side oil cooler tubes is the same.
1.
Using 1-5/8 inch wrench, hold two adapters (A)
one at a time and, using 1-1/2 inch wrench, loosen
two jamnuts (B) one at a time.
2.
Using 1-5/8 inch wrench, remove two adapters (A)
and gaskets (C) from oil cooler (D).
3.
Throw gaskets (C) away.
NOTE
Upon removing tubes and fittings,
seal
powerplant
openings
with
plastic barrier material (Item 41,
Appendix D) and masking tape (Item
57,
Appendix
D)
to
prevent
unnecessary exposure to moisture
and contamination.
Remove plastic
barrier material and masking tape
when installing tubes and fittings.
Go on to Sheet 3
TA147625
6-179