TM 9-860-260-20-1-2
TURBOCHARGER SHROUDS REPLACEMENT (Sheet 6 of 6)
Upper Shroud Replacement (Sheet 1 of 1)
TOOLS:
1/2 in. combination box and open end wrench
1/2 in. socket with 1/2 in. drive
5 in. extension with 1/2 in. drive
Ratchet with 1/2 in. drive
SUPPLIES:
Self-locking nut (MS21045-16)
PRELIMINARY PROCEDURES:
Remove powerplant (page 5-1)
Remove engine shroud (page 9-2)
Remove rear engine shroud support (page 9-4)
NOTE
Procedures for replacement of the left or right turbocharger shrouds are similar.
Procedures for the left side are shown.
REMOVAL:
1
Using 1/2 inch socket with extension and 1/2 inch wrench, remove bolt and self-locking nut (A).
Throw self-locking
nut (A) away.
2.
Using 1/2 inch socket, remove three bolts (B).
3.
Remove upper shroud (C).
INSTALLATION:
1.
Position upper shroud (C) in place.
2.
Install three bolts (B).
3.
Install bolts and new self-locking nut (A).
4.
Using 1/2 inch socket with extension and 1/2 inch wrench, tighten bolts (A) and (B).
5.
Install rear engine shroud support (page 9-5).
6.
Install engine shroud (page 9-3).
7.
Install 2A powerplant (page 5-14) or 2D powerplant (page 5-40).
End of Task
TA146864
9-18