TM 9-2350-260-20-1-2
TURBOCHARGER SHROUDS REPLACEMENT (Sheen 4 of 6)
Inner Shroud Replacement
11.
Install transmission oil cooler lines (page 6-140 or 6-149).
12.
Ground hop engine (page 554) and check for oil leaks.
13.
Install rear engine shroud support (page 9-5).
14.
Disconnect engine from powerplant test run hookup (page 5-67).
15.
Install engine shroud (page 9-3).
16.
Install 2A powerplant (page 5-14) or 2D powerplant (page 5-40).
End of Task
9-16