TM 9-2350-260-20-1-3
MASTER CONTROL PANEL REPAIR (Sheet 36 of 71)
Bilge Pump Switch and Indicator Light Replacement (Sheet 4 of 4)
5.
Using finger, install lamp (F) in base assembly (G) by pushing in and turning clockwise.
6.
Place base assembly (G) in position on panel.
7.
Using screwdriver, install two screws (H) and new lockwashers (J) securing base assembly (G) to panel.
8.
Apply silicone compound (Item 32, Appendix D) to electrical connector (K).
9.
Using fingers, connect electrical connector (K) to base assembly (G) by pushing in.
10. Place new preformed packing (L) in position on lens (M).
11. Using fingers, install lens (M) in panel by turning clockwise.
12. Install panel in tank (page 10-56).
End of Task
TA147130
10-98