TM 9-2350-260-20-1-3
ENGINE OIL TEMPERATURE TRANSMITTER REPLACEMENT (2A ENGINE)(Sheet 2 of 2)
INSTALLATION:
1.
Lightly coat threads of bushing (A) and oil temperature transmitter (B) with sealing compound (Item 20, Appendix D).
2.
Using 15/16 inch socket install bushing (A) into engine.
3.
Using deep well socket, install transmitter (B) to bushing (A).
4.
Connect electrical lead (C) onto transmitter (B).
5.
Remove rags from under transmitter.
6.
Connect engine for powerplant ground hop (page 5-54).
7.
Start and run engine.
Observe oil temperature indicator for normal oil temperature.
(TM 9-2350-260-10).
8.
Shut down engine.
Disconnect engine from powerplant ground hop (page 5-67).
9.
Install powerplant (page 5-14).
End of Task
TA147295
10-263