TM 9-2350-260-20-1-3
ENGINE OIL HIGH PRESSURE TRANSMITTER REPLACEMENT (2A ENGINE)(Sheet 2 of 2)
INSTALLATION:
1.
Lightly coat threads of bushing (A) and transmitter (B) with sealing compound (Item 20, Appendix D).
2.
Using socket, install bushing (A) into engine.
3.
Using wrench, install transmitter (B) onto bushing (A).
4.
Connect electrical lead (C) to switch (B).
5.
Fill engine with oil (LO 9-2350-260-12).
6.
Connect engine for powerplant ground hop (page 5-54).
7.
Start and run engine.
Observe oil temperature indicator for normal oil temperature.
(TM 9-2350-260-10)
8.
Shut down engine.
Disconnect engine from powerplant ground hop (page 5-67).
9.
Install powerplant (page 5-14).
TA147299
End of Task
10-267