TM 9-2350-260-20-1-3
ENGINE OIL HIGH TEMPERATURE SWITCH REPLACEMENT (2D ENGINE)(Sheet 2 of 2)
REMOVAL:
1.
Place rags (Item 65, Appendix D) under switch.
2.
Pull socket of rubber insulated connector (A) from switch cap (B).
3.
Using socket, remove switch (C) from engine.
INSTALLATION:
1.
Lightly coat threads of switch with sealing compound (Item 20, Appendix D).
2.
Using socket, install switch (A) into engine.
3.
Lubricate rubber connector (B) with silicone
compound (Item 32, Appendix D).
4.
Push socket of rubber insulated connector (B) into
switch cap (C).
5.
Remove rags from under switch
6.
Connect engine for powerplant ground hop (page 5-54).
7.
Start and run engine.
Observe temperature indicator for normal oil temperature (TM 9-2350-260-10).
8.
Shut down engine.
Disconnect engine from powerplant ground hop (page 5-67).
9.
Install powerplant (page 5-40).
End of Task
TA147306
10-274