TM 9-2350-260-20-1-3
BATTERY TESTING AND REPLACEMENT (Sheet 10 of 13)
INSTALLATION:
1.
Using battery carrier (A), install batteries through turret floor (B).
2.
Position six batteries (C) on support.
Terminals must be oriented as shown.
Go on to Sheet 11
TA147341
10-309