TM 9-2350-261-20-2
REPLACE STARTER — Continued
0236 00
4.
Install two new lockwashers (7) (Delco and Leece Neville only) and circuit 75A lead (8) on terminal of starter solenoid.
Secure with nut (9) (screw on Prestolite).
5.
Install new lockwasher (10) and circuit 6 lead (11) on terminal of solenoid (4). Secure with nut (12).
6.
Install new lockwasher (13) and two ground leads (14) on terminal of starter (3). Secure with nut (15).
7.
Install exhaust pipe (WP 0189 00).
8.
Close power plant front access door (see your -10).
9.
Raisetrimvane(seeyour-10)
.
FOLLOW-THROUGH STEPS
1.
Install power plant (WP 0131 00), if removed.
2.
Connect battery ground lead (WP 0294 00).
3.
Start engine. Check that starter is operable (see your -10).
4.
Stop/shutdown engine (see your -10).
END OF TASK
0236 00-6