TM 9-2350-261-20-2
REPLACE INSTRUMENT PANEL MOUNTS AND GROUND LEADS
0238 00
THIS WORK PACKAGE COVERS:
Removal (page 0238 00-1).
Installation (page 0238 00-2).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0780 00, Item 29)
Materials/Parts
Lockwasher (4)
Locknut (4)
Personnel Required
Unit Mechanic
Equipment Condition
Engine stopped/shutdown (see your -10)
Battery ground lead disconnected (WP 0294 00)
REMOVAL
1.
Remove two locknuts (1), bottom mounts (2), screws (3), flat washers (4), and top mounts (5) from two struts (6) and
(7) and instrument panel. Discard locknuts.
2.
Support instrument panel and remove two bolts (8), ground lead (9), and two lockwashers (10) from two resilient mounts
(11) and upper support bracket. Discard lockwashers.
3.
Tip instrument panel forward and remove two bolts (12), ground lead (9), two lockwashers (13), and resilient mounts
(11) from instrument panel. Discard lockwashers.
023800-1