REPLACE FRONT BILGE PUMP PIPES
0323 00
THIS WORK PACKAGE COVERS:
Removal (page 0323 00-1).
Installation (page 0323 00-2).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0780 00, Item 29)
Torque Wrench (WP 0780 00, Item 106)
Socket Wrench (WP 0780 00, Item 95)
Materials/Parts
Gasket
Grommet
Locknut (4)
Personnel Required
Unit Mechanic
Equipment Condition
Engine stopped/shutdown (see your -10)
Carrier blocked (see your -10)
Trim vane lowered (see your -10)
Power plant front access door open (see your -10)
Hull front access cover removed (WP 0429 00)
Front bilge pump strainer removed (WP 0322 00, Steps
1-2)
REMOVAL
1.
Remove two screws (1), washers (2), and clamps (3) from two bulkhead weldnuts.
2.
Loosen four clamps (4). Remove lower pipe (5) from upper pipe (6) and bilge pump. Remove clamp (3), clamps (4),
and two hoses (7) from pipe (5).
3.
Loosen two clamps (8). Slide pipe (6) from discharge outlet and remove pipe from driver’s compartment. Remove
clamp (3), clamps (8), and hose (9) from pipe.
032300-1