TM-9-2350-261-20-2

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 2 OF 4

  TM-9-2350-261-20-2 - Page 563 of 1008

TM 9-2350-261-20-2
REPLACE FRONT BILGE VALVE
0324 00
THIS WORK PACKAGE COVERS:
Removal (page 0324 00-1).
Inspection-Acceptance and Rejection Criteria (page 0324 00-1).
Installation (page 0324 00-2).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0780 00, Item 29)
Personnel Required
Unit Mechanic
Materials/Parts
Locknut (3)
Equipment Condition
Engine stopped/shutdown (see your -10)
Ramp lowered (see your -10)
Driver’s rear floor plate removed (WP 0439 00)
Personnel heater floor duct removed (WP 0617 00)
Left front floor plate removed (WP 0437 00,
WP 0438 00, and WP 0441 00)
REMOVAL
1.
Remove three locknuts (1), six washers (2), and three screws (3) from hull cross beam (4). Discard locknuts.
2.
Remove valve (5) from beam. Inspect valve.
INSPECTION-ACCEPTANCE AND REJECTION CRITERIA
1.
Check valve, housing, and fittings for cracks, leaks, and wear. Replace if needed.
032400-1


Back to Top