TM 9-2350-261-20-2
REPLACE FRONT BILGE PUMP PIPES — Continued
0323 00
FOLLOW-THROUGH STEPS
1.
Install front bilge pump strainer (WP 0322 00, Steps 9 - 12).
2.
Turn MASTER SWITCH to ON (see your -10). Operate bilge pump and check for leaks. Turn all switches OFF (see
your -10).
3.
Install hull front access cover (WP 0429 00).
4.
Close power plant front access door (see your -10).
5.
Raisetrimvane(seeyour-10)
.
END OF TASK
0323 00-3/4 blank