TM-9-2350-261-20-2

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 2 OF 4

  TM-9-2350-261-20-2 - Page 720 of 1008

TM 9-2350-261-20-2
REPLACE T150 TRACK SHOE PAD ASSEMBLY — Continued
0370 00
INSTALLATION
1.
Install stud (4) of track shoe pad (1) through track shoe (2) from under track and install new locknut (3) on stud.
2.
TIGHTEN LOCKNUT (3) TO 120–150 LB-FT (162–293 N·M) TORQUE. Use torque wrench.
0370 00-2
FOLLOW-THROUGH STEPS
1.
Unblock carrier (see your -10).
2.
Road test carrier to check that track shoe pad is installed correctly (see your -10).
END OF TASK


Back to Top