TM-9-2350-311-20-2

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR CAB, ARMAMENT, SIGHTING AND FIRE CONTROL, ELEVATING AND TRAVERSING SYSTEMS AND ASSOCIATED COMPONENTS

DECEMBER 1993

  TM-9-2350-311-20-2 - Page 270 of 828

TM 9–2350–311–20–2
5–14
Change 2
5–7
SPINDLE ASSEMBLY
This task covers:
a.
Removal
b.
Disassembly
c.
Assembly
d.
Installation
INITIAL SETUP
Tools
Artillery and turret mechanic’s tool kit
(SC 5180–95–CL–A12)
Spanner wrench (item 17, Appx H)
Materials/Parts
Lockwashers (2) (item 68, Appx G)
Rag (item 25, Appx D)
Soap (item 9, Appx D)
Spring pin (item 11.1, Appx G)
Personnel Required
2
Equipment Condition
Firing mechanism removed (TM 9–2350–311–10)
Rack springs removed (para 2–4)
Relieve tension on adjuster (TM 9–2350–311–10)
a.
Removal
CAUTION
Be careful when opening breechblock with spring tension released. Use operating handle to sup-
port breechblock as it is being opened. Otherwise, carrier will slam open and may be damaged.
1
Open breechblock (1) using one mechanic to slowly move operating handle (2) and the other to support
breechblock. Return operating handle to stop.
2
Depress detent (3) with punch.
3
Rotate breechblock (1) to LOCKED position.
1
3
2
LOCK
UNLOCK


Back to Top